Gigantic road closures in Schwerin from June 16th – This is how it continues!
From June 16, 2025, there will be extensive road closures in Schwerin due to construction work and an event. Learn more.

Gigantic road closures in Schwerin from June 16th – This is how it continues!
There will soon be some changes in Schwerin that drivers should take note of. Starting June 16, 2025, the city will experience several road closures due to planned construction work and an event. Loud Schwerin-lokal.de Ellerried is particularly the focus of the measures.
Here, a section between the Eckdrift intersection and the entrance to the B 106 (bypass) will be completely closed. This renovation will run from June 16th to July 11th, 2025, with the diversion via Grabenstrasse being put in place. The Great Waterway will also be closed during this period, specifically in the section between house numbers 18 to 20, where new district heating house connections are being laid.
Full closures and diversions
Particular attention should be paid to the road to the train station. This was originally only blocked until June 14, 2025, but the ban has now been extended until July 4, 2025. The affected section between the Platz der Freiheit and the Zum Bahnhof 3 building remains a dead end, so access is only possible via Severinstrasse.
In addition, there will be closures on Schleifmühlenweg between Paulshöher Weg and Parkweg on June 20th from 8 a.m. to 6 p.m. The reason for this is the 29th Open Dragon Boat Championships for students, which need to run smoothly. Detours will also be set up here to direct traffic.
Traffic situation and forecasts
The current traffic situation in and around Schwerin is also reported by verkehrslage.de closely observed. There you can find information about traffic jams or obstructions caused by construction sites or detours. For example, slow traffic is to be expected on the A1 between Maschener Kreuz and Hamburg-Stillhorn, which is particularly relevant for commuters.
Anyone planning to drive in the next few days or weeks can ADAC Maps to get real-time traffic flow and disruptions. The platform not only provides information about acute construction sites, but also about everyday traffic conditions on motorways, federal highways and in cities. This can be particularly advantageous when planning routes.
With all these changes, Schwerin is facing a challenging phase. Motorists should be well informed and prepared to avoid possible delays. A little patience and waiting for the construction work are now on the agenda - because after the inconvenience there is usually an improvement in the road conditions.