Traffic chaos in Bad Harzburg: B4 closed until October due to construction site!
Current traffic reports for the Goslar district: Construction sites and restrictions on the B4 in Bad Harzburg until October 1st, 2025.

Traffic chaos in Bad Harzburg: B4 closed until October due to construction site!
There is currently a construction site in Bad Harzburg that not only affects the city center, but also leads to significant traffic restrictions. On the popular B4 between the Marienteichbaude and the Radau waterfall, the left lane will be closed until October 1, 2025. This leads to increased traffic volumes and the risk of temporary traffic jams. The restrictions are currently valid until 5:00 p.m [news.de](https://www.news.de/auto/858953251/verkehrsmelde-bad-harzburg-bad-harzburg-innenstadt-harz-lk-goslar-landkreis-goslar-auf-b4-nordhaeuser-str asses-to-traffic-disruption-due-to-the-construction-site-with-closure-until-10-01-2025-restrictions-in-traffic-danger-of-congestion-in-lower-saxony-forst-bad-harzburg-mari/1/) reported.
The planned construction measures are part of a more comprehensive traffic management in Lower Saxony, which will be of great importance for the future planning of traffic routes. Passers-by and drivers should prepare for the detour through Nordhäuser Straße, which is also very busy. The construction site requires a lot of patience from the people in the region.
Current traffic information
There is a mixed picture in the region: While drivers on the B4 have to expect disruptions, the situation on the A36 has eased considerably. Commuters and travelers who regularly use the routes need to keep their eyes open and react flexibly.