Traffic chaos in Bad Harzburg: K46 closed for bridge tear!

Verkehrseinschränkungen im Landkreis Goslar: Sperrung der K46 vom 23. bis 27. Juni 2025 wegen Brückenabriss, Staugefahr erwartet.
Traffic restrictions in the district of Goslar: blocking of the K46 from June 23 to 27, 2025 due to bridge tear. (Symbolbild/MND)

Traffic chaos in Bad Harzburg: K46 closed for bridge tear!

A look at the streets in the Goslar district shows that from June 23, 2025, traffic problems must be expected again. A bridge demolition on the K46 at Harlingerode ensures a block that will last until June 27, 2025. Let us take a closer look at the situation and what this means for road users.

The restrictions begin on Monday, June 23, 2025, at 6:00 a.m. and end on Tuesday, June 27, 2025, at 8:00 a.m. During this time, the K46, which also leads through Bettingerode and Gut Radau, is affected in both directions and is likely to demand a lot from the drivers. How [news.de] (https://www.news.de/auto/858714727/ Verkehrsordnung-bad-harzburg-landkreis-goslar-auf-k46-zur-zur-wegen-sper Rung-von-23-06-2025-to-27-06-2025-Raumen-Raffe-Stamm-Niedersachsen-Bettingerode-Gut-Radau-Radau-Plz-PLZ-38667/1/) reports, the road users must expect stusceptible traffic and occasional traffic jams, since the diversion signage should be observed.

roads and diversions

Especially in rural areas, it is often a challenge when important traffic axes are blocked. The diversions must be clearly communicated in order not to put any additional strain on traffic in the region. All those affected should not only adapt to the situation on site, but also use online traffic information. Real-time traffic flow data and information about current construction sites via ADAC Maps.

The traffic situation is observed permanently by many. Websites such as stau.info offer current reports of traffic jams, accidents and other traffic disorders that can be an advantage for drivers in the region. The current reports show that there are also some construction work and problems on the motorways and other important routes in the area that can cause additional traffic.

An example is the A7 between Hanover and Kassel, where there is currently a 5 km of traffic jam. So if you plan to be on the road in the time of the blocking, you should prepare well and have alternative routes in your head.

A look outside the box

Numerous other traffic problems are also noticeable, which can sometimes even be relevant for pedestrians during the day. On the A61, for example, there are construction sites that also cause delays due to an accident. The entire traffic information is important in order not to turn in the wrong direction.

If the closure comes into force on June 23, this could be a real challenge for many commuters and travelers. Therefore: already plan the routes and inform about the possibilities in advance! We wish all drivers a safe and patient drive through the upcoming restrictions.

Details
OrtBad Harzburg, Deutschland
Quellen