Refurbishment of the A31 between Emden and Riepe: full closure on July 1!

Refurbishment of the A31 between Emden and Riepe: full closure on July 1!
Good news for all drivers on the A31 motorway between Emden and Riepe: In the coming week, the roadway in need of renovation will finally be repaired. The sacking was already known before the time of the bridge construction work, but now the problem area is finally being tackled. Like Nwzonline , the work will begin on Tuesday, July 1st Wednesday, July 2nd at 5 a.m.
The affected route extends between the Emden-Ost and Riepe junctions, where the right main lane is partially sagged. Drivers are called to drive off at the Emden-Wolthusen junction and to follow the signposted diversion. This leads to the Riepe junction via Emden-Wolthusen (U11) and Emden-Ost (U13). The condition is viewed empty particularly before the Riepe departure in the direction of travel.
previous problems and conversions
The sacking showed themselves before the new bridge was built. The condition that now makes a full closure necessary has not been caused by the construction work. Such situations are not the exception. There are a total of 240 kilometers of road on the A31, which ranges from Emden to Bottrop and is affected several times from traffic jams, such as Stammelder-karte.de explained.
Only recently it was also known that many motorway bridges in Germany, including in the vicinity of North Rhine-Westphalia, are inadequate. An analysis of more than 3,786 motorway bridges showed that 43 bridges have a "unfavorable" state for more than 50 meters, which can affect both stability and traffic safety. The condition of these bridges has been particularly worrying since the partial fall of the Carolbrücke in Dresden, such as ZEIT ONLINE
FAZIT
The upcoming renovation on the A31 between Emden and Riepe is an important step to secure the road infrastructure. Especially in times when traffic is increasingly shaped by heavy transports, it is crucial that both streets and bridges are kept in a traffic -proof state. Drivers should keep the construction site in the head and use the diversions in good time to avoid traffic jams and unnecessary waiting times.
Details | |
---|---|
Ort | Emden, Deutschland |
Quellen |