Rex-Brauns-Straße bus stop: renovation work ends – barrier-free!
Barrier-free conversion of the Rex-Brauns-Straße bus stop in Hildesheim is planned and is expected to be completed on December 4th.

Rex-Brauns-Straße bus stop: renovation work ends – barrier-free!
There is great anticipation because work on the Rex-Brauns-Straße bus stop is almost complete. The result of this extensive construction project will be visible on December 3rd, 2025, shortly before the planned release on Thursday, December 4th. After almost four months of construction, citizens will soon be able to use a completely barrier-free stop.
The Hildesheim City Drainage Department (SEHi) renovated the stormwater sewer, while the energy supply company (EVI) carried out the necessary pipeline work. In addition, a sewer shaft was replaced and the road surface was renovated. This not only improves comfort for passengers, but also sustainably optimizes the infrastructure. This information can be obtained from a message on the city of Hildesheim's website, which reported on the progress of the construction work: [stadt-hildesheim.de](https://www.stadt-hildesheim.de/portal/meldeen/rex-brauns-strasse-bushaltestelle-kanal-und-deckschicht- Werden-erneuert-900004117-33610.html).
Accessibility in focus
One of the most important goals of the project was to create barrier-free access to the stop. This resource was funded with the support of the Lower Saxony State Local Transport Company and the Hildesheim district. What is particularly pleasing is the installation of a tactile guidance system that was specifically designed for blind and visually impaired people. It enables clear guidance through tactile floor indicators that make orientation easier.
In order to organize the orders efficiently and to keep traffic disruptions as low as possible, the entire project was carried out by one company. A highlight of the construction project is the fact that all of this work was part of the renovation work on the stormwater sewer that was already underway, which started on August 18, 2025.
Disruptions and diversions
As is usual with large construction sites, there were some challenges during the renovation phase, in particular the required full closure of Rex-Brauns-Straße. The reason for this was the central location of the canal in the roadway. But there is good news for residents and business owners: All properties remained within walking distance during construction, and the hypermarkets are still accessible from the south. Only line 5 of Hildesheim city transport had to be rerouted to make the work possible.
Overall, however, the measures have created a clear perspective that will significantly improve public transport in the Hildesheim region. From December 4th, the first passengers will be able to fully use the newly designed stop. In a place that has seen many stories over the years, the renovation sets new standards for future generations.
It looks like the Rex-Brauns-Straße bus stop will not only become a practical starting point for commuters and visitors, but also a symbol of progress and proximity to citizens in Hildesheim. This is great news for everyone who goes about their everyday lives here and one more reason to use public transport in the region.