Construction site chaos in Kiel: All closures and detours at an overview!

Aktuelle Baustellen in Kiel: Informationen zu Sperrungen, Reparaturen und zukünftigen Projekten am 20. Juni 2025.
Current construction sites in Kiel: Information on closures, repairs and future projects on June 20, 2025. (Symbolbild/MND)

Construction site chaos in Kiel: All closures and detours at an overview!

The streets in Kiel are currently changing, which presents us with some challenges. In the state capital there are numerous construction sites that affect both traffic and infrastructure. According to KN-Online.de , the following construction sites are particularly worth mentioning:

full closures in detail

The Eichenbergskamp remains completely closed until June 27, 2025, since urgent repairs are carried out on two rainwater connection lines. The Hasseer Straße will not be accessible until June 27, 2025. Here, conversion and expansion measures between house numbers 78 and 100 are on the plan.

An important section for cyclists is the Flensburger Straße in Kiel-Wik : This will be completely closed until June 30, 2025 to expand the Velo route. Here all cyclists should adjust to changes and, if necessary, plan alternative routes.

In addition, there is a one-sided blocking by June 30, 2025 in Preetzer Straße in Kiel-Gaarden-Ost , since a day clinic is created here. While the Wörthstraße in Kiel-Schreventeich is closed until July 4, 2025, which is affected due to repair work on two wastewater connections, the Eggerstedtstraße/Wall is closed until July 31, 2025 to carry out facade work on a corner building.

The old Lübeck Chaussee is a serious problem. Here the work on the railway bridge lasts until 2027, which also leads to a reduced bridge height by September 30, 2025. The traffic volume is regulated by a traffic light system.

traffic routing and height controls

Deutsche Bahn took care of the renewal of the railway bridges on the Alten Lübeck Chaussee. The passage height is reduced to 3.60 meters, which means that many truck drivers have to expect problems. A digital height control was installed to ensure that excessive vehicles are turned in time. In the event of a trigger, all traffic lights in the street return to red, which temporarily brings traffic to a standstill. LED boards inform the drivers about the turning process, and there are also information in English in order to avoid language barriers.

Innovative support for mobility in the region offers the Master portal of Kielregion . This interactive webapp enables users to view current mobility -related data and planning. It is a great opportunity for everyone to learn more about the proportion of different modes of transport in overall traffic and to find out more about planned cycling routes or mobility stations.

prospects for future construction sites

In addition to the current construction sites,

For the future, there are a few more projects. From April to June 2025, work on the Kiel main train station is planned, where bus stops are replaced and the roofs are to be greened. The Westring complete renovation and the renewal of the road cover on Stresemannplatz will be carried out from July 2025. There will also be temporary restrictions here.

The current and upcoming construction projects in Kiel show that the city is on the upper, even if the structural change is associated with challenges for the transport infrastructure. We can be excited to see how the situation will develop in the coming months and look forward to a well -developed and networked city.

Details
OrtKiel, Deutschland
Quellen